Skip to content

Importing goods from the EU to the Czech Republic — step by step

Importing goods from the EU to the Czech Republic — step by step

Goods from another EU state enter the Czech Republic without customs duty or clearance; an invoice and a CMR consignment note are enough. The Incoterms clause decides who arranges transport — under EXW and FCA it is the buyer. Transport from Germany and Austria usually takes 1–2 days, from Italy and France 2–3 days, from Spain and Portugal 3–4 days.

Key facts

Customs within the EUnone, goods are in free circulation
Documentsinvoice and CMR consignment note
Who books transportper Incoterms; under EXW and FCA the buyer
Transit timeDE/AT 1–2 days, IT/FR 2–3 days, ES/PT 3–4 days
Non-EU goodscustoms clearance before collection

Importing from another EU country is easier than ever: goods are not cleared through customs and there is no waiting at the border. A few points still matter — who pays for the transport, which documents travel with the goods and how much time to allow.

What you need for an import within the EU

Goods in free circulation in the EU are not cleared through customs between member states. The truck carries the invoice (or delivery note) and the CMR consignment note. The exception is excise goods — alcohol and tobacco — which need an electronic accompanying document issued by the consignor.

If both supplier and buyer are VAT-registered with a VAT number valid in VIES, the supplier invoices without VAT and the buyer accounts for the tax in the Czech Republic. Above the statutory threshold the importer also reports the trade to the Intrastat statistics.

Who books the transport — Incoterms

The delivery clause in the sales contract decides who arranges and pays for transport. We explain them in detail in our article on Incoterms; for imports these are the most common:

ClauseWho books transportWhat it means for you
EXWbuyergoods are ready at the supplier’s warehouse, you arrange the transport
FCAbuyerthe supplier loads the goods, you arrange the onward transport
DAPsupplierthe supplier delivers to your address, unloading is yours
DDPsupplierthe supplier bears all costs up to the destination

Under EXW and FCA the transport is in your hands — you can compare offers and choose the date that suits you.

How to prepare an import enquiry

  • Loading and delivery address including postcode.
  • Quantity — number and size of pallets or loading metres, and the total weight.
  • Date the goods are ready and the required delivery date.
  • Loading and unloading — dock, forklift, or a tail lift needed.
  • Type of goods — chilled goods, stackable pallets or oversized items.

The online calculator gives an indicative price and we send a quote within 30 minutes.

How much time to allow

Country of loadingUsual transit time
Slovakia, Austriawithin 1 day
Germany, Poland1–2 days
Netherlands, Belgiumwithin 2 days
Italy, France2–3 days
Spain, Portugal3–4 days

Allow for weekend and holiday truck driving bans in transit countries — see the driving ban calendar and all countries on the transit times page.

Full truck or just a few pallets

From roughly 7 loading metres (about 18 pallets) a full truck usually pays off; smaller shipments travel as part loads and you only pay for the space they take. The differences are explained in FTL vs. LTL. Chilled goods travel in a reefer trailer with monitored temperature.

Goods from outside the EU

If goods arrive at a European seaport from overseas (Hamburg, Rotterdam, Antwerp, Koper), they must be customs-cleared before collection. Clearance is handled by the importer or their customs agent; the truck then collects the goods from the terminal or warehouse like a normal EU shipment.

Related services: International transport · Pallet transport

Related guides: How to request a transport quote — what to include for a fast, accurate offer

See also: Truck transport · Importing goods into the Czech Republic

Frequently asked questions

Do goods bought in another EU country need customs clearance when they enter Czechia?
No customs duty or clearance applies inside the EU. The shipment only needs an invoice or delivery note and a CMR consignment note.
What applies when importing wine, beer or spirits from an EU supplier?
Alcohol and tobacco are excise goods, so besides the invoice and CMR an electronic accompanying document is required. The sender issues it, not the carrier.
Why does my German supplier invoice me without VAT?
If both parties hold valid VAT numbers that can be checked in VIES, the supplier invoices net and the Czech buyer accounts for the VAT. That is why the supplier verifies your number before delivery.
What is Intrastat and does it apply to my import?
Intrastat is the statistical report on trade in goods between EU states. An importer files it once their purchases from the EU exceed the statutory threshold.
My supplier quotes EXW – what does that mean for me?
Under EXW the buyer books and pays for transport and the goods are collected at the supplier's premises. We can arrange that collection and the run to you in Czechia.
How do FCA and DAP differ when buying in the EU?
Under FCA the seller hands the goods to a carrier you appoint, so you book the transport. Under DAP and DDP the seller arranges the journey all the way to you.
How quickly do goods loaded in Slovakia or Austria arrive?
From Slovakia and Austria the shipment is usually in Czechia within 1 day of loading. That is the shortest import lane in the guide.
How long does an import from the Netherlands or Belgium take?
From Benelux allow up to 2 days from loading. From Germany and Poland it is usually 1–2 days.
Why can an import from Spain or Portugal take longer?
The run itself takes 3–4 days, and weekend or holiday driving bans in transit countries can add time. Build that into any production or sales plan that depends on the goods.
At what volume does a full truck pay off for an import?
The usual threshold is around 7 loading metres (about 18 pallets). Smaller imports travel as groupage and you pay only for the space they take.
Can chilled food be imported from the EU?
Chilled goods from other EU countries travel in temperature-controlled reefer trailers. State the temperature range in your enquiry.
Will you collect goods from China that arrived by sea at a European port?
Goods from outside the EU must be customs-cleared before collection, which the importer or their customs agent handles. Once released for free circulation they can travel on to Czechia.
Can imported goods go straight to my customer in Slovakia?
We deliver EU goods anywhere in Czechia and Slovakia, so they can run directly from your supplier to your customer. Give the final unloading address in the enquiry.
Who pays for freight if the contract names no delivery term?
The delivery term in the sales contract decides who books and pays for transport, so agree it with the supplier beforehand. Without it you risk nobody turning up for loading – or two carriers.
What should an import enquiry include?
The loading address in the EU country and the delivery point, pallet count or dimensions or loading metres with weight, dates and loading conditions. Also say whether the goods are chilled, stackable or oversized.
Jaromír Knapek · Knapek Spedition Freight forwarding and road transport, Břeclav · Published · Updated 22. 10. 2026