How building materials are shipped depends on whether they are heavy, long, bulky or fragile: tiles use up the payload, insulation the space, plasterboard needs a flat base and windows need rigid stands. The delivery point matters just as much, because a site without a dock or forklift needs a vehicle with a tail lift or the site's own equipment. If you mention these points up front, we can pick the right vehicle first time.
How do the different materials compare?
| Material | Main constraint | Suitable vehicle | What to prepare |
|---|---|---|---|
| Tiles | high weight per pallet | curtainsider trailer, rigid, 7.5 t truck | weight of each pallet, stretch wrapping |
| Plasterboard | board length, fragile edges, moisture | trailer or rigid with enough deck length | bundle dimensions, support along the full length |
| Insulation | large volume, low weight | high-volume vehicle such as a mega trailer | number and size of bales |
| Windows and doors | glass, frames, must stay upright | curtainsider with stands, side loading | number of stands, dimensions, corner protection |
Why are tiles all about weight?
Ceramic tiles are very heavy per pallet, so on a trailer with 33 pallet places and around 24 tonnes of payload you usually cannot fill every place. The pallets also have to be spread evenly over the deck so that no axle is overloaded. A lot of tiles come from Italy and Spain; from the Italian production areas we arrange transport from Italy as part or full loads.
What to watch with plasterboard and sheet materials?
Plasterboard sheets are usually 1,250 mm wide and typically two to three metres long. They must lie flat and be supported along their whole length, or they sag and crack. Straps easily damage the edges, so edge protectors go under every strap. The boards must not get wet: they travel in a closed curtainsider, and on site there should be a covered place to put them down.
How is insulation and other bulky material moved?
Mineral wool or polystyrene is light but takes a lot of room. Here the volume and internal height of the load space decide, not the weight. For smaller quantities a rigid or 7.5 t truck works; for large volumes, a trailer with extra internal height. So tell us the number of bales and their size, not only the weight.
How do windows arrive undamaged?
Windows and patio doors travel upright on A-frame stands or in crates, strapped down, with corner protection and spacers between the sashes. Windows laid flat and loose get damaged on the way. Stands are often loaded from the side, so a curtainsider with a sliding curtain suits best. Our vehicle types page gives an overview.
How does unloading work on a building site?
A building site rarely has a dock and often has no forklift. The usual options are:
- a vehicle with a hydraulic tail lift for pallets within its lifting capacity,
- unloading with site equipment such as a telehandler or loader with forks,
- a truck with a loader crane, which you can request separately and we check availability,
- side unloading with the consignee's forklift where there is firm ground next to the truck.
Read more in our article on unloading without a dock. Heavy construction machines are a separate case, covered in our guide to machinery transport.
Checklist for your transport order
- type of material and packing (pallets, bundles, stands, bales),
- dimensions, especially board length and pallet height,
- weight of each pallet or of the whole shipment,
- how it will be unloaded and how the site is accessed (road width, firm ground),
- a site contact who receives the goods and signs the CMR or delivery note.
How to request a quote for building materials
In your quote request, give the loading address and site address, the material, dimensions, weight and how unloading will be done. You will receive a quote within 30 minutes during office hours, and EU goods travel without customs formalities.