Machinery transport requires the dimensions, weight, centre of gravity and loading method (crane, forklift, dock). Machines within standard dimensions (width 2.55 m, height about 4 m) travel on a curtain-sided trailer with an opening roof or side, heavy items are secured with chains or straps to the deck. Loads exceeding dimensions or weight are oversized transport requiring a permit.

Key facts

Standard load widthup to 2.55 m
Standard heightabout 4 m including vehicle
Loadingcrane from above or side, forklift, dock
Securingchains or straps, anti-slip mats
Oversizerequires permits and route planning

Machine tools, production lines, moulds or compressors do not travel like pallets. What matters is weight, centre of gravity, loading method and whether the machine fits within standard dimensions. Good preparation saves waiting on site and extra costs.

A machine can travel safely on a standard truck as long as its dimensions, weight, centre of gravity and the handling equipment at both ends are known in advance. These details decide the vehicle (curtainsider, flatbed, low loader) and how the load is secured. If a piece exceeds normal width or height, it becomes an oversized move that needs a permit and several extra days of planning.

What do we need to know about the machine before booking?

Most trouble with machinery comes from estimated rather than measured sizes. Measure at the widest and tallest point, including control panels, handles and anything that sticks out, and say whether the machine stands on a pallet, on skids or on its own feet.

  • Length, width and height in centimetres, ideally with a photo or drawing.
  • Weight from the rating plate and how it is distributed — presses and machining centres often have an off-centre centre of gravity.
  • Lifting and lashing points — where a crane may hook on or forks may go underneath.
  • Condition — fluids drained, moving parts locked, fragile attachments removed.
  • Handling on site — loading dock, forklift, crane, or none of these.

Who loads the machine, and with what?

The driver does not load. The shipper is responsible for loading and the consignee for unloading, so equipment has to be agreed beforehand. A forklift needs enough capacity and long enough forks; for pieces of several tonnes an ordinary warehouse truck is often not enough. A curtainsider can be loaded from the side with the curtain pulled back, or from above once the roof is opened, which suits crane work. If nothing is available on site, a mobile crane or a machine-moving crew with skates can be booked — as long as this is known in time.

Which vehicle suits which machine?

VehicleGood forWatch out for
Van up to 3.5 tSmall machines and spare parts on a pallet, urgent jobsLimited payload and internal height
7.5 t or rigid truck with tail liftMachines up to roughly one tonne, no forklift at deliveryLift capacity, firm and level ground
Curtainsider semi-trailerMost machines on pallets or skidsSide or top loading, internal height
Flatbed or low loaderTall and heavy pieces, oversized loadsPermits, route planning, longer lead time

To estimate the space you need, use the loading metre calculator: a full trailer offers 13.6 loading metres and one euro pallet takes 0.4 m.

How is a machine secured on the trailer?

It must not shift even under emergency braking. Typical tools are ratchet straps through the lashing points, anti-slip mats under the feet and, for heavy pieces, timber chocks or chains. Straps are never run across fragile covers or control panels. A machine bolted to its pallet or skids is easier and safer to secure. Tall, narrow machines with a high centre of gravity tip more easily, so mention that in the order.

When does it become an oversized transport?

A standard articulated truck is 2.55 m wide and overall height in Europe is usually limited to 4 m. If the load goes beyond these figures or the permitted weight, the move needs a permit, sometimes an escort vehicle and an approved route. Depending on the country and the scope this typically takes several days. Partial dismantling — removing a cab, conveyor or top section — often keeps the load within normal dimensions and is worth considering.

Which documents are required?

Within the EU, commercial documents and a delivery note are enough; the CMR waybill confirms handover and the condition of the goods. Write any damage visible on unloading straight onto the CMR and take photos. EU goods need no customs clearance.

What should your request include?

  1. Pickup and delivery addresses and the preferred date.
  2. Dimensions, weight and a photo of the machine, plus the number of pieces.
  3. How it will be loaded and unloaded (forklift, crane, tail lift).
  4. Whether it can be dismantled or placed on a pallet.

Send us these details and during office hours you will have a quote within 30 minutes; we usually arrange a vehicle within 24 hours, tolls included. For a first estimate you can also try the online calculator.

Related services: Vehicle types · International transport

Frequently asked questions

What details do you need for machinery transport?
Dimensions including protruding parts, weight, centre of gravity, loading and unloading method, and the loading and delivery places.
How is a heavy machine loaded?
Usually by crane from above onto a curtain-sided trailer with the roof slid back, or by forklift from the side.
What if there is no crane or forklift on site?
A mobile crane or a truck-mounted crane is needed — mention it in your enquiry.
How is the machine secured on the vehicle?
With chains or straps according to weight, with anti-slip mats underneath.
What is the standard maximum load width?
2.55 m. Wider loads are oversized and need a permit.
How high can the load be?
The total height of vehicle and load is usually about 4 m; taller items go on a MEGA trailer or as oversized transport.
What is oversized transport?
Transport of a load exceeding standard dimensions or weight. It needs a permit in every country on the route and a planned route.
How long does an oversize permit take?
It depends on the countries and dimensions; permits are obtained in advance, so plan ahead.
Can you carry a small machine on a pallet?
Yes, small machines on pallets go by van, rigid truck or as a part load.
Which vehicle for machines of several tonnes?
Usually a rigid truck 7.5–12 t with curtain; heavier and larger items on a curtain-sided trailer.
How do you protect a machine’s control panels?
With film or covers and by fixing moving parts.
Are machines cleared through customs within the EU?
No, within the EU they travel with an invoice or delivery note and a CMR consignment note.
Do you move machinery between Germany and the Czech Republic?
Yes, we arrange machinery transport between Germany, Austria, the Czech Republic and Slovakia.
Can a machine be combined with other pallets?
Yes, if dimensions and securing allow, the machine and pallets can share one vehicle.
Why does the centre of gravity matter?
It determines how the machine is lifted and secured so it does not tip over when braking.